Week & Date | Vasyl | Time Spent | Jordan | Time Spent | Zachary | Time Spent | Goup | Time Spent |
---|---|---|---|---|---|---|---|---|
Week 01: 05/07 - 05/13 | Redone phone app to connect to BLE module, modified code to work as independent app, manual mode implemented & tested using LEDs. Each mode sends strings when selected. | 25 hrs | Configure controller, motor driver, & motor to work together. Building frame for blinds, brainstorming. Creating code & testing whether motor/motor driver can move blinds. | 18 hrs | Began working on code for both sensors in separate programs to ensure correct operation. Ordered additional parts & materials for testing and troubleshooting. | 20 hrs | Assigned tasks to complete for next week and post to website as completed. | 4 hrs |
Week 02: 05/14 - 05/20 | Wired Arduino & BLE module to LEDs for testing, sending time to board, custom mode nearly complete (cant delete timers yet), references updated. | 19 hrs | Extensive testing with motor &coupling, created fixture for motor, bought & modified new coupling & performed extensive testing. Testing whether more torque is needed from motor. | 16 hrs | Tested each sensor for correct operation using LED’s based on measured lux values. Began designing & prep for construction of sensor puck, that will communicate wirelessly to main board. | 16 hrs | Researched Researched batteries for blinds & sensors, future in-person meetings to put everything together. What we have completed thus far. | 3.5 hrs |
Week 03: 05/21 - 05/27 | Custom mode saves/edits all user start/stop times & blinds angle.Timer sorted by start time. Tested all functions of app through COM. Software flowchart for program is done. | 28 hrs | Finishing the mechanical aspects of the project. Extensive testing of the motors power consumption. Troubleshooting/brainstorming for electrical aspects. | 16 hrs | Assembled & began testing battery powered sensor puck. Troubleshooting system to ensure battery charges while system is running. Battery duration may need to be increased. | 16 hrs | Exchange components for responsible parts. Looked over current design, setup of the blinds, motor placement, and how to change it. Bought another set of blinds to disassemble. | 3 hrs |
Week 04: 05/28 - 06/03 | Fixed: flowchart, App diagram, updated data being sent to Arduino, started code for Arduino: time is updated on Arduino, modes, AUTO & CUSTOM are done. | 26 hrs | Tested power bank to charge and discharge, got power supplied by solar panel to charge battery, got power from solar panel to the load. | 18 hrs | Continued testing of battery powered system ensuring its powered while charging, and added bluetooth modules so the two systems can communicate. | 20 hrs | Gone over time frame finishing code, aditing website, talk about ways to have constant power to main Arduino. | 2.5 hrs |
Week 05: 06/04 - 06/10 | Data sent by App is parsed by MCU, all modes are identified by MCU, Custom mode is done: timers are parsed and cycle through timers. | 25 hrs | Finished and tested all the electrical work for the main system. | 12 hrs | Continued testing bluetooth modules, ensuring integrity of data being sent. Began researching ways to store data in case either circuit loses power. | 14 hrs | Set up times to meet in person, which modes to test first with motor, plan on combining individual codes. | 3 hrs |
Week 06: 06/11 - 06/17 | Combined parsed app data w/ motor to test manual/custom mode, fixed app chart, ordered extra parts needed. | 14 hrs | Tested the manual mode with Vasyl, troubleshooted the system, and locked in half of the components into the housing. | 20 hrs | Assembled and tested sensor modules with new components to power the system. Battery capacity may need to be increased. | 18 hrs | Met in-person to test manual/ custom mode. Manual mode motor function needs to be fixed, up/down only opens blinds. Custom mode is yet to be tested. | 6 hrs |
Week 07: 06-18 - 06/24 | Modified code to turn ON/ OFF motor driver to prevent motor overheating. Tested Manual/ Custom mode with Jordan. Constructed blinds holder for independent testing. | 24.5 hrs | Fixed the issue with the boost converter, charge controller, and systems high current issue. Locked everything in place, successfully tested manual and custom mode with Vasyl. | 25 hrs | Tested data transmission between sensor modules over varying distances. Fixed data loss issue by sending data twice. | 18 hrs | Two team meeting were used to test and troubleshoot the manual/ custom mode. Last team meeting discussion of sensor placement and final fitting of the project inside the blinds. | 14 hrs |
Week 08: 06/25 - 07/01 | Coded/ installed: RTC module (time keeping), 2nd BLE device, used Zack’s code and wrote AUTO to main MCU. | 30+ hrs | Tested and implemented a new solar panel, battery, and charge controller into the system. | 12 hrs | Worked with V to adjust sensor code to implement Auto mode. Commenced Final testing of sensor modules 20 ft apart. Began writing final report | 20 hrs | V and Jordan met up to discuss placements of componets in blinds, Vasyl and Zack worked on getting AUTO mode logic coded and room sensor to send key markers. | 5 hrs |
Week 09: 07/02 - 07/09 | Soldered new terminals for arduino connections, rewired system, fixed: auto mode, layout of app. Tested blinds in window for 24hrs, used lux app to compensate sensors, worked on ch2 (software) of report. | 34 hrs | Made an adjustable fixture for our outside light sensor. Met up with Vasyl to test auto mode, and worked on chapter 3 of the report. | 20 hrs | Soldered and handed off components to V for full system testing, continued working on the report. | 23 hrs | V and Jordan met up to test auto mode, bluetooth range, moving multiple terminal connections to PCB board, wired 2nd set of blinds for power/ temperature measurements. | 8 hrs |
Week 10: 07/10 - 07/15 | Attempted to fix custom mode to have timers more timers (failed), fixed phone app (visually), set limit on auto mode angle, worked on report: ch2 (software), ch3 (software). | 32 hrs | Worked with Vasyl to conduct the tests trials for custom and manual mode. Worked on the hardware development section and the results and discussion section of chapter 3. | 30 hrs | Worked on the Troubleshooting section of CH3, the Control module section of CH2, and made small changes in CH 4 | 18 hrs | Vasyl and Jodan met to run trials on manual and custom mode, got them on video | 6 hrs |
Week 11: 07/16 - 07/23 | Final touches on blinds assembly, changing battery connector, made changes to software in ch3, format & read report. Adding info to the presentation. | 25 hrs | Finished fitting components into blinds housing, report: engineering requirement trials, construction of the blinds housing. Adding info to the presentation. | 30 hrs | Made Changes to the remote sensor in CH 3 and Budget in CH 4. Formatted and proofread the report. Added info to the presentation. | 22 hrs | Jordan and Vasyl met on campus to put all components into blinds housing, testing every function to make sure nothing was loose. | 7.5 hrs |